Monte Carlo Project Schedule Simulator
Simulate project schedules and costs using Monte Carlo methods with distributions, dependencies, and risk reports. Supports separate duration and cost modeling with auto export to the Risk Register.
Activity Distribution Configuration
Use this section to configure either duration or cost for each activity. Toggle the mode below. PERT and ±% tools will apply to the currently selected mode.
Apply Uniform Adjustments
Apply PERT Adjustments
Mode:
| Activity | Base Duration | Distribution | Parameters | Max Duration (Do Not Exceed) |
|---|
Dependency Configuration
Configure logic ties between activities for the duration schedule model. These are used for critical path / project duration simulations.
| Activity | Predecessor | Dependency Type | Lead/Lag (days) |
|---|